MPE was called to a HV fault at a new site. Found the network tripped the customer CB and DNO supplies had been restored the night before. Arranged and fitted a generator to restore supplies in the short term and resourced HV switchgear, joints and cable for restoration. Job completed within expected timeframe and the customer was satisfied.
We carry out installations on behalf of OCU for SSE. We also design, build and energise HV networks on behalf of private network customers.
Inspection and maintenance of of HV systems designed to meet customers specifications. Systems that are regularly checked are much more likely to continue to operate smoothly, which prevents costly downtime.